Skip to content
tew-services

Technical project design & delivery

End-to-end engineering solutions for complex projects in public and private sectors, including manufacturing, water, transport, construction, commercial buildings and industrial.

Electrical and mechanical design expertise for demanding engineering applications

In-house facilities for pre-construction project equipment manufacturing and sub-assembly

Electrical and mechanical equipment installation and related civil and construction works.
Proactive asset maintenance, repair, refurbishment and upgrades.

Qualified expertise in project work for hazardous areas and high voltage applications.

Multidiscipline engineering projects with complex scope, scale and technical requirements.
Whatever the industry, TEW brings its combination of agile thinking and high-level expertise.
20190222_101802

Renew Raw Water Pump Motors, Water Treatment Plant, North Pine

LocationNorth Pine, Petrie
Client/s

 — SEQWater

Value$470K

 

Project Scope

North Pine Water Treatment Plant undertook an upgrade of ACB’s over their Raw Water Pumps to improve safety and access to the Raw Water Pumps.  Following on from this work and still be completed is the replacement of the Raw Water Pump Motors.

  • Electrical & Mechanical Design
  • Electrical Installation
  • Mechanical Installation

 

IMG_9008

 

Challenges

  • Arc flash management during investigations and undertaking works in areas affected.
  • Tight shutdown timeframes while maintaining backup power systems.
  • Multiple stakeholders including owner design engineers with design ownership.
  • Integration and testing of motor management controllers with new single speed motors.
  • Selection of motors suited for Variable Speed Drive upgrade.
  • Vibration management and testing.

 

Outcomes

  • Successful procurement, supply, installation, test and commissioning of 150 kW TEFC motors.
  • Successful detailed design and installation of blast wall for arc fault mitigation.
  • Successful detailed design, procurement, installation test and commissioning of Air Circuit Breakers and Motor Circuit Breakers within existing switchboard for arc flash reduction and mitigation.
  • Successful reduction in vibrations once new motors and minor adjustments undertaken.

 