Skip to content
tew-services

Technical project design & delivery

End-to-end engineering solutions for complex projects in public and private sectors, including manufacturing, water, transport, construction, commercial buildings and industrial.

Electrical and mechanical design expertise for demanding engineering applications

In-house facilities for pre-construction project equipment manufacturing and sub-assembly

Electrical and mechanical equipment installation and related civil and construction works.
Proactive asset maintenance, repair, refurbishment and upgrades.

Qualified expertise in project work for hazardous areas and high voltage applications.

Multidiscipline engineering projects with complex scope, scale and technical requirements.
Whatever the industry, TEW brings its combination of agile thinking and high-level expertise.
TEW ATT Truss Hydrapress Upgrades 01

Truss Hydrapress and Electrical Systems Upgrades, Nerang

LocationNerang,
Gold Coast
Client/s

 — Australian Timber
     & Trusses

Value$320K

 

Project Scope

TEW was engaged by Australian Timber & Trusses (ATT) to undertake the electrical re-design, decommissioning, re-construction and commissioning of their Hydrapress Jig 1. This included an initial investigation and design in conjunction with ATT to produce a safer and more productive machine utilising modern communication networks, servo drives and safety systems. 

TEW was later engaged by ATT to undertake a complete refurbishment of their second Hydrapress. This incorporated a complete redesign of the electrical system, communication network and instruments allowing for a safer and more productive system while providing critical production information. 

 

  • Electrical design of Hydrapress
  • Electrical design of new switchboard and control cabinet
  • Electrical & Instrumentation Installation
  • Electrical, Instrumentation & Control upgrades

 

TEW ATT Truss Hydrapress Upgrades 07

 

Challenges

  • Upgrading existing package machine with new technology while maintaining the same footprint.
  • Complex movement of machine items. 13 Heads each with slightly different Y and X axis movement.
  • Standard power, control and communications cables were not fit for purpose, the machine required special high flex and oil resistant cables.
  • Multiple moving components and cable containment clashes.
  • Alignment of overall functional safety system.
  • Unique commissioning requirements and fault finding during proof of performance testing.

 

Outcomes

  • Decrease in overall downtime, increased productivity, visibility and system performance.
  • Built in redundancy of communications system which allows machine to continue to function while parts are procured ready for installation.
  • Documented electrical infrastructure.

 