## Project Scope

- Construct with design responsibilities
- E&I detailed design, procurement, installation, test and commissioning of Mechanical and Process equipment.
- Detailed design, fabrication and delivery including installation of Main Switchboard, Motor Control Centre and various PLC and Network enclosures.
- Supply authority liaison including supply of authorised workers.
- Site delivery across Two (2) Treatment Plants including integration with existing functioning Treatment Plant Power and Control System.
- Arc flash and AS 61439 compliance.

 

 

## Challenges

- Existing building constraints impacting on new Electrical Infrastructure.
- Interfacing with multiple stakeholders delivering adjacent works.
- Interfacing with existing electrical infrastructure within an existing operational Waste Water Treatment Plant.
- Design deviations during project installation works.
- Expedited project delivery.
- Extended delivery lead times due to supply chain impacts.

 

## Outcomes

- Successful design, construction and installation of Electrical Infrastructure within existing Building envelope.
- Successful alignment with key stakeholders to assist with expedited project delivery.
- Successful integration with existing Power and Control Systems.
- Successful detailed design and alignment with various overarching technical specifications (end Client and Supply Authority).

 

[View full post](https://tewsolutions.com.au/projects/recycled-water-disinfection-facility-construction)

```json
{
  "@context" : "http://schema.org",
  "@type" : "BlogPosting",
  "author" : {
    "@type" : "Person",
    "name" : "Taya Griffiths"
  },
  "dateModified" : "2023-06-15T23:50:55.912Z",
  "datePublished" : "2023-05-31T14:15:00Z",
  "headline" : "Recycled Water Disinfection Facility Construction, Caboolture South STP",
  "image" : {
    "@type" : "ImageObject",
    "height" : 1117,
    "url" : "https://6563214.fs1.hubspotusercontent-na1.net/hubfs/6563214/Projects/tew-engineering-projects-caboolture-south-STP.png",
    "width" : 1728
  },
  "mainEntityOfPage" : "https://tewsolutions.com.au/projects/recycled-water-disinfection-facility-construction",
  "publisher" : {
    "@type" : "Organization",
    "logo" : {
      "@type" : "ImageObject",
      "height" : 60.0,
      "url" : "https://6563214.fs1.hubspotusercontent-na1.net/hubfs/6563214/tew-logo-fav.png",
      "width" : 60.0
    },
    "name" : "Projects"
  }
}
```